General Information
B16115 (Storm Water Drainage Asset)
The storm drain portion of the project will replace approximately 540 linear feet of corrugated metal pipe (CMP) across multiple locations in the Oak Park community. The deteriorated 15” CMP located at Quince Street and Chollas Parkway will be abandoned and redirected using appropriately sized new pipe and connected to the existing Municipal Separate Storm Sewer System (MS4). The existing 18” and 24” CMP, and 24” steel pipe at the end of Chollas Station Drive will be realigned and replaced.
Dastgheibi, Sara
9, 4
MID-CITY:EASTERN AREA
Project Location Map: Click Here
Estimated Project Schedule(1)
Use mouse wheel to zoom in and out of timeline.
Schedule to be determined.
If timeline does not show, please click here for instructions on how to resolve this.
 
Estimated Project Dollar Amount(1)   
(1) $21,113,998
Construction Activity
(1) $13,102,859
(3) Partially Funded
To Be Selected
(1) Duration to be determined.
Additional Remarks
None
See B16114 for Storm Water Drainage Asset Click Here
Notes:
1. The cost and schedule data shown here are the City’s current best estimates and subject to frequent change. Changes (if any) are updated once a month.
2. To learn more about Capital Improvement Projects, visit: The Citizens Guide to the Capital Improvement Program.
3. Fully Funded means there are sufficient funds for construction phase and Partially Funded means that there are insufficient funds for construction phase.