NCPWF Influent Pump Station and Pipeline
(Design Bid Build Project)
|
|
Project Information Details
|
NCPWF Influent Pump Station and Pipeline
|
(Design Bid Build Project)
|
Print Page
|
General Information
|
|
B16140
(Water Asset)
|
This project entails the construction of a new Pure Water Facility Influent Pump Station and pipeline which will be located at the existing NCWRP site. The new pump station will be designed to deliver up to 42.5 mdg of tertiary treated effluent produced by the NCWRP to the future Pure Water Facility. The conveyance pipeline delivering the flow will be a 42-inch steel pipe approximately 1,525 feet in length.
|
|
Martin, Reyhaneh
|
|
6
|
|
|
Project Location Map:
|
Click Here
|
Estimated Project Schedule(1)
Use mouse wheel to zoom in and out of timeline.
|
|
Schedule to be determined.
|
If timeline does not show, please click here for instructions on how to resolve this.
|
|
Estimated Project Dollar Amount(1)
|
(1)
|
$46,851,625
|
Construction Activity
|
(1)
|
$31,003,681
|
(3)
|
Fully Funded
|
|
Kiewit Infrastructure West Co.
|
(1)
|
59 Months
|
|
|
See S17012 for Sewer Asset
Click Here
|
See B21060 for Sewer Asset
Click Here
|
Notes:
1. The cost and schedule data shown here are the City’s current best estimates and subject to frequent change. Changes (if any) are updated once a month.
2. To learn more about Capital Improvement Projects, visit:
The Citizens Guide to the Capital Improvement Program.
3. Fully Funded means there are sufficient funds for construction phase and Partially Funded means that there are insufficient funds for construction phase.
|
For questions or concerns about the project, call the Public Works Department
construction project information line at (619) 533-4207, email
engineering@sandiego.gov,
or
submit your inquiry online.
Please reference the project name in your inquiry.
|
Form PWD1502
|
10/01/2024
|
|
|