Project Information Details
70th-Alvarado to Saranac-Sidewalk
(Design Bid Build Project)
|
|
Project Information Details
|
70th-Alvarado to Saranac-Sidewalk
|
(Design Bid Build Project)
|
Print Page
|
General Information
|
|
B17065
(Transportation Asset)
|
The project proposes to install new concrete sidewalk on the west side of 70th street between Alvarado Road and Saranac Street. The work is to include installation of new 4' and 5' wide concrete sidewalk, curb and gutter, retaining walls, chain link fence, 6' wide bike land striping, traffic striping and signing, and relocation/adjustment of signs.
|
|
Schultz, Louis
|
|
9
|
|
|
Project Location Map:
|
Click Here
|
Estimated Project Schedule(1)
Use mouse wheel to zoom in and out of timeline.
|
|
Schedule to be determined.
|
If timeline does not show, please click here for instructions on how to resolve this.
|
|
Estimated Project Dollar Amount(1)
|
(1)
|
$707,825
|
Construction Activity
|
(1)
|
$278,625
|
(3)
|
Fully Funded
|
|
W. A. Rasic Construction Company, Inc.
|
(1)
|
30 Months
|
|
|
See S11026 for Water Asset
Click Here
|
See B24001 for Transportation Asset
Click Here
|
Notes:
1. The cost and schedule data shown here are the City’s current best estimates and subject to frequent change. Changes (if any) are updated once a month.
2. To learn more about Capital Improvement Projects, visit:
The Citizens Guide to the Capital Improvement Program.
3. Fully Funded means there are sufficient funds for construction phase and Partially Funded means that there are insufficient funds for construction phase.
|
For questions or concerns about the project, call the Public Works Department
construction project information line at (619) 533-4207, email
engineering@sandiego.gov,
or
submit your inquiry online.
Please reference the project name in your inquiry.
|
Form PWD1502
|
10/01/2024
|
|
|