Project Information Details
Crown Point Drive Roundabouts
(Design Bid Build Project)
|
|
Project Information Details
|
Crown Point Drive Roundabouts
|
(Design Bid Build Project)
|
Print Page
|
General Information
|
|
B18009
(Transportation Asset)
|
Provide traffic calming and pedestrian safety improvements along Crown Point Drive. This street is adjacent to Mission Bay Park and is prone to heavy pedestrian activity. TSW has also received many complaints/concerns about speeding traffic & pedestrian safety from residents along this street. Speed studies have confirmed that traffic is exceeding the speed limit by a significant amount. This project is supported by the Climate Action Plan.
|
|
Ashrafzadeh, Mastaneh
|
|
2
|
|
|
Project Location Map:
|
Click Here
|
Estimated Project Schedule(1)
Use mouse wheel to zoom in and out of timeline.
|
|
Schedule to be determined.
|
If timeline does not show, please click here for instructions on how to resolve this.
|
|
Estimated Project Dollar Amount(1)
|
(1)
|
$3,663,300
|
Construction Activity
|
(1)
|
$2,130,000
|
(3)
|
Partially Funded
|
|
To be selected
|
(1)
|
Duration to be determined.
|
|
|
See B19089 for Storm Water Drainage Asset
Click Here
|
Notes:
1. The cost and schedule data shown here are the City’s current best estimates and subject to frequent change. Changes (if any) are updated once a month.
2. To learn more about Capital Improvement Projects, visit:
The Citizens Guide to the Capital Improvement Program.
3. Fully Funded means there are sufficient funds for construction phase and Partially Funded means that there are insufficient funds for construction phase.
|
For questions or concerns about the project, call the Public Works Department
construction project information line at (619) 533-4207, email
engineering@sandiego.gov,
or
submit your inquiry online.
Please reference the project name in your inquiry.
|
Form PWD1502
|