Project Information Details
AC Water & Sewer Group 1054 (W)
(Design Bid Build Project)
|
|
Project Information Details
|
AC Water & Sewer Group 1054 (W)
|
(Design Bid Build Project)
|
Print Page
|
General Information
|
|
B18107
(Water Asset)
|
The scope for water will include replacing approximately 14,968 LF (2.83miles) of existing AC water main and appurtenances, including associated water services, fire hydrants, curb ramps, traffic control, etc. along Stream View Drive from 54th Street to College Avenue. The scope for water also includes abandoning 0.27 miles of 6-inch AC water mains. This WBS is bundled with B18108 and S18000
|
|
Rekani, Ronak
|
|
9, 4
|
|
|
Project Location Map:
|
Click Here
|
Estimated Project Schedule(1)
Use mouse wheel to zoom in and out of timeline.
|
|
Schedule to be determined.
|
If timeline does not show, please click here for instructions on how to resolve this.
|
|
Estimated Project Dollar Amount(1)
|
(1)
|
$9,589,375
|
Construction Activity
|
(1)
|
$7,899,294
|
(3)
|
Partially Funded
|
|
To Be Selected
|
(1)
|
Duration to be determined.
|
|
|
See B18108 for Sewer Asset
Click Here
|
See S18000 for Transportation Asset
Click Here
|
Notes:
1. The cost and schedule data shown here are the City’s current best estimates and subject to frequent change. Changes (if any) are updated once a month.
2. To learn more about Capital Improvement Projects, visit:
The Citizens Guide to the Capital Improvement Program.
3. Fully Funded means there are sufficient funds for construction phase and Partially Funded means that there are insufficient funds for construction phase.
|
For questions or concerns about the project, call the Public Works Department
construction project information line at (619) 533-4207, email
engineering@sandiego.gov,
or
submit your inquiry online.
Please reference the project name in your inquiry.
|
Form PWD1502
|