|
|
Project Information Details
MLK Rec Center Moisture Intrusion
(Design Bid Build Project)
|
|
Project Information Details
|
MLK Rec Center Moisture Intrusion
|
(Design Bid Build Project)
|
Print Page
|
General Information
|
|
B19001
(Parks Asset)
|
The scope includes the rehabilitation of roof drains, flashing at the retaining wall & sealant at the swale/retaining wall joint; abandon the drain inlet in the vestibule; install a new curb outlet; regrade the area near the courtyard & replace the all storm drain piping; replace concrete drainage ditch; repair of shear walls and floors of raquetball courts and mold treatment
|
|
Schroth-Nichols, Elizabeth
|
|
4
|
|
|
Project Location Map:
|
Click Here
|
Estimated Project Schedule(1)
Use mouse wheel to zoom in and out of timeline.
|
|
Schedule to be determined.
|
If timeline does not show, please click here for instructions on how to resolve this.
|
|
Estimated Project Dollar Amount(1)
|
(1)
|
$2,815,168
|
Construction Activity
|
(1)
|
$1,317,320
|
(3)
|
Fully Funded
|
|
Fordyce Construction, Inc.
|
(1)
|
19 Months
|
|
|
Notes:
1. The cost and schedule data shown here are the City’s current best estimates and subject to frequent change. Changes (if any) are updated once a month.
2. To learn more about Capital Improvement Projects, visit:
The Citizens Guide to the Capital Improvement Program.
3. Fully Funded means there are sufficient funds for construction phase and Partially Funded means that there are insufficient funds for construction phase.
|
For questions or concerns about the project, call the Public Works Department
construction project information line at (619) 533-4207, email
engineering@sandiego.gov,
or
submit your inquiry online.
Please reference the project name in your inquiry.
|
Form PWD1502
|
10/01/2024
|
|
|