Project Information Details
Streamview Drive Green Infrastructure
(Design Bid Build Project)
|
|
Project Information Details
|
Streamview Drive Green Infrastructure
|
(Design Bid Build Project)
|
Print Page
|
General Information
|
|
B19095
(Storm Water Drainage Asset)
|
This project is bundled with S18000 Streamview Drive Improvements Phase 2. This WBS provides for the installation of the multi-use treatment area (MUTA) on Streamview Drive between 55th Street and 54th Street, which will drastically aid in improving the water quality within Chollas Creek by reducing the Total Maximum Daily Loads (TMDLs) within this watershed. The MUTA will consist of a diversion structure, pretreatment structure, detention vault, and a filtration vault.
|
|
Rekani, Ronak
|
|
9, 4
|
|
|
Project Location Map:
|
Click Here
|
Estimated Project Schedule(1)
Use mouse wheel to zoom in and out of timeline.
|
|
Schedule to be determined.
|
If timeline does not show, please click here for instructions on how to resolve this.
|
|
Estimated Project Dollar Amount(1)
|
(1)
|
$24,222,655
|
Construction Activity
|
(1)
|
$19,416,048
|
(3)
|
Partially Funded
|
|
To Be Selected
|
(1)
|
Duration to be determined.
|
|
|
See S18000 for Transportation Asset
Click Here
|
See B18107 for Water Asset
Click Here
|
Notes:
1. The cost and schedule data shown here are the City’s current best estimates and subject to frequent change. Changes (if any) are updated once a month.
2. To learn more about Capital Improvement Projects, visit:
The Citizens Guide to the Capital Improvement Program.
3. Fully Funded means there are sufficient funds for construction phase and Partially Funded means that there are insufficient funds for construction phase.
|
For questions or concerns about the project, call the Public Works Department
construction project information line at (619) 533-4207, email
engineering@sandiego.gov,
or
submit your inquiry online.
Please reference the project name in your inquiry.
|
Form PWD1502
|
11/01/2024
|
|
|