The City of San Diego Project Information Details
Redwood Village/Rolando Park Improv 2(W)
(Design Bid Build Project)
The City of San Diego
Project Information Details
Redwood Village/Rolando Park Improv 2(W)
(Design Bid Build Project)
Print Page  
General Information
B19194 (Water Asset)
Construction of approximately 20,330 linear feet ¿LF¿ ¿3.85 miles¿ of 8-inch polyvinyl chloride ¿PVC¿ water mains to replace existing 6-in and 8-in asbestos cement ¿AC¿ water mains and construction of approx. 40 feet of new 8-in PVC water main via open trench. Abandon 1,971 LF ¿0.37 miles¿ of existing AC water main. The project also includes transferring existing water services from the to be abandoned 8-inch water main on Rock Street to the 16-inch water main on the same street.
Narvaez, Rex
9, 4
MID-CITY:EASTERN AREA
Project Location Map: Click Here
Estimated Project Schedule(1)
Use mouse wheel to zoom in and out of timeline.
Schedule to be determined.
If timeline does not show, please click here for instructions on how to resolve this.
 
Estimated Project Dollar Amount(1)   
(1) $8,434,000
Construction Activity
(1) $5,588,900
(3) Partially Funded
To Be Selected
(1) Duration to be determined.
Additional Remarks
None
See B15030 for Water Asset Click Here
Notes:
1. The cost and schedule data shown here are the City’s current best estimates and subject to frequent change. Changes (if any) are updated once a month.
2. To learn more about Capital Improvement Projects, visit: The Citizens Guide to the Capital Improvement Program.
3. Fully Funded means there are sufficient funds for construction phase and Partially Funded means that there are insufficient funds for construction phase.
For questions or concerns about the project, call the Public Works Department construction project information line at (619) 533-4207, email engineering@sandiego.gov, or submit your inquiry online.
Please reference the project name in your inquiry.
Form PWD1502 04/01/2024