Project Information Details
Azalea Hollywood Park Improvements 1 (w)
(Design Bid Build Project)
|
|
Project Information Details
|
Azalea Hollywood Park Improvements 1 (w)
|
(Design Bid Build Project)
|
Print Page
|
General Information
|
|
B21081
(Water Asset)
|
Overlay of approximately 35,000 SF (or 0.25 miles) of road way on Columbine Road and Pepper Drive. Paving work should have been completed by previous water group job and funded by PUD. However, work was removed for a future project that never materialized.
|
|
Sleiman, Alex
|
|
Geo-Mapping is in progress
|
|
|
Project Location Map:
|
Click Here
|
Estimated Project Schedule(1)
Use mouse wheel to zoom in and out of timeline.
|
|
Schedule to be determined.
|
If timeline does not show, please click here for instructions on how to resolve this.
|
|
Estimated Project Dollar Amount(1)
|
(1)
|
$130,000
|
Construction Activity
|
(1)
|
$30,847
|
(3)
|
Fully Funded
|
|
Burtech Pipeline, Incorporated
|
(1)
|
46 Months
|
|
|
See B17134 for Sewer Asset
Click Here
|
See B17141 for Water Asset
Click Here
|
Notes:
1. The cost and schedule data shown here are the City’s current best estimates and subject to frequent change. Changes (if any) are updated once a month.
2. To learn more about Capital Improvement Projects, visit:
The Citizens Guide to the Capital Improvement Program.
3. Fully Funded means there are sufficient funds for construction phase and Partially Funded means that there are insufficient funds for construction phase.
|
For questions or concerns about the project, call the Public Works Department
construction project information line at (619) 533-4207, email
engineering@sandiego.gov,
or
submit your inquiry online.
Please reference the project name in your inquiry.
|
Form PWD1502
|
12/01/2024
|
|
|