The City of San Diego Project Information Details
Azalea Hollywood Park Improvements 1 (w)
(Design Bid Build Project)
The City of San Diego
Project Information Details
Azalea Hollywood Park Improvements 1 (w)
(Design Bid Build Project)
Print Page  
General Information
B21081 (Water Asset)
Overlay of approximately 35,000 SF (or 0.25 miles) of road way on Columbine Road and Pepper Drive. Paving work should have been completed by previous water group job and funded by PUD. However, work was removed for a future project that never materialized.
Sleiman, Alex
Geo-Mapping is in progress
Geo-Mapping is in progress
Project Location Map: Click Here
Estimated Project Schedule(1)
Use mouse wheel to zoom in and out of timeline.
Schedule to be determined.
If timeline does not show, please click here for instructions on how to resolve this.
 
Estimated Project Dollar Amount(1)   
(1) $130,000
Construction Activity
(1) $30,847
(3) Fully Funded
Burtech Pipeline, Incorporated
(1) 46 Months
Additional Remarks
None
See B17134 for Sewer Asset Click Here
See B17141 for Water Asset Click Here
Notes:
1. The cost and schedule data shown here are the City’s current best estimates and subject to frequent change. Changes (if any) are updated once a month.
2. To learn more about Capital Improvement Projects, visit: The Citizens Guide to the Capital Improvement Program.
3. Fully Funded means there are sufficient funds for construction phase and Partially Funded means that there are insufficient funds for construction phase.
For questions or concerns about the project, call the Public Works Department construction project information line at (619) 533-4207, email engineering@sandiego.gov, or submit your inquiry online.
Please reference the project name in your inquiry.