Alvarado 2nd Extension Pipeline
(Design Bid Build Project)
|
|
Project Information Details
|
Alvarado 2nd Extension Pipeline
|
(Design Bid Build Project)
|
Print Page
|
General Information
|
|
S12013
(Water Asset)
|
Replace 20,592 LF of existing AC water mains and construct 33,897 LF of new water main. Added Scope: Morena Blvd (0.32 mi) and Sea World Drive (0.33 mi) for coordination with Pure Water Morena Pipeline project and Mission Bay Master Plan. Deleted Scope: AC main on Friars Road between Fashion Valley Road and Frazee Road (0.43 mi). Added scope required additional schedule time for supplemental survey and design.
|
|
Ramos-Banuelos, Jaime
|
|
3, 7, 9, 2
|
|
|
Project Location Map:
|
Click Here
|
Estimated Project Schedule(1)
Use mouse wheel to zoom in and out of timeline.
|
|
Schedule to be determined.
|
If timeline does not show, please click here for instructions on how to resolve this.
|
|
Estimated Project Dollar Amount(1)
|
(1)
|
$156,958,563
|
Construction Activity
|
(1)
|
$116,489,471
|
(3)
|
Partially Funded
|
|
OHLA USA, Inc.
|
(1)
|
Duration to be determined.
|
|
|
See B22025 for Transportation Asset
Click Here
|
Notes:
1. The cost and schedule data shown here are the City’s current best estimates and subject to frequent change. Changes (if any) are updated once a month.
2. To learn more about Capital Improvement Projects, visit:
The Citizens Guide to the Capital Improvement Program.
3. Fully Funded means there are sufficient funds for construction phase and Partially Funded means that there are insufficient funds for construction phase.
|
For questions or concerns about the project, call the Public Works Department
construction project information line at (619) 533-4207, email
engineering@sandiego.gov,
or
submit your inquiry online.
Please reference the project name in your inquiry.
|
Form PWD1502
|
10/01/2024
|
|
|