The City of San Diego Project Information Details
Tecolote Canyon Trunk Sewer Improvement
(Design Bid Build Project)
The City of San Diego
Project Information Details
Tecolote Canyon Trunk Sewer Improvement
(Design Bid Build Project)
Print Page  
General Information
S15020 (Sewer Asset)
Rehabilitate 7,551 LF of 15-inch; upsize 7,350 LF of 15-inch to 18-inch; upsize 790 LF of 18-inch to 21-inch; upsize 5,230 LF of 21-inch to 24-inch; upsize 2,060 LF of 21, 24-inch to 27-inch and upsize 1,990 LF of 24-inch to 30-inch. Misc. improvements to small vehicle access(addition of $1.5 M per Memo 5/7/2015). Major elements of work are the stream crossings, and backfill/slope restoration and erosion protection of manholes. Some new trail branches will be added.
Narvaez, Rex
7, 2
LINDA VISTA, CLAIREMONT MESA
Project Location Map: Click Here
Estimated Project Schedule(1)
Use mouse wheel to zoom in and out of timeline.
Schedule to be determined.
If timeline does not show, please click here for instructions on how to resolve this.
 
Estimated Project Dollar Amount(1)   
(1) $55,137,803
Construction Activity
(1) $44,495,069
(3) Partially Funded
J.R. Filanc Construction Company, Inc.
(1) Duration to be determined.
Additional Remarks
None
See B15203 for Water Asset Click Here
Notes:
1. The cost and schedule data shown here are the City’s current best estimates and subject to frequent change. Changes (if any) are updated once a month.
2. To learn more about Capital Improvement Projects, visit: The Citizens Guide to the Capital Improvement Program.
3. Fully Funded means there are sufficient funds for construction phase and Partially Funded means that there are insufficient funds for construction phase.
For questions or concerns about the project, call the Public Works Department construction project information line at (619) 533-4207, email engineering@sandiego.gov, or submit your inquiry online.
Please reference the project name in your inquiry.
Form PWD1502 10/01/2024