Project Information Details
Upper Auburn Creek Revitalization
(Design Bid Build Project)
|
|
Project Information Details
|
Upper Auburn Creek Revitalization
|
(Design Bid Build Project)
|
Print Page
|
General Information
|
|
S22008
(Storm Water Drainage Asset)
|
The goal of this project is to implement stream revitalization of Auburn Creek. The project area has been segmented into five (5) reaches and the limits of the study area are generally between University Avenue and Auburn Drive. This portion of Auburn Creek frequently experiences storm events that cause flooding of adjacent areas, including residential structures, roads, and public parks. Auburn Creek also shows signs of severe erosion caused by high-velocity flows.
|
|
Dastgheibi, Sara
|
|
9
|
|
|
Project Location Map:
|
Click Here
|
Estimated Project Schedule(1)
Use mouse wheel to zoom in and out of timeline.
|
|
Schedule to be determined.
|
If timeline does not show, please click here for instructions on how to resolve this.
|
|
Estimated Project Dollar Amount(1)
|
(1)
|
$86,810,695
|
Construction Activity
|
(1)
|
$37,355,603
|
(3)
|
Partially Funded
|
|
To Be Selected
|
(1)
|
Duration to be determined.
|
|
|
Notes:
1. The cost and schedule data shown here are the City’s current best estimates and subject to frequent change. Changes (if any) are updated once a month.
2. To learn more about Capital Improvement Projects, visit:
The Citizens Guide to the Capital Improvement Program.
3. Fully Funded means there are sufficient funds for construction phase and Partially Funded means that there are insufficient funds for construction phase.
|
For questions or concerns about the project, call the Public Works Department
construction project information line at (619) 533-4207, email
engineering@sandiego.gov,
or
submit your inquiry online.
Please reference the project name in your inquiry.
|
Form PWD1502
|
11/01/2024
|
|
|