|
|
Project Information Details
Sunset Cliffs Seawall Improvement
(Design Bid Build Project)
|
|
Project Information Details
|
Sunset Cliffs Seawall Improvement
|
(Design Bid Build Project)
|
Print Page
|
General Information
|
|
S23006
(Transportation Asset)
|
Construction of seawall improvements for insurance of public safety and protection of infrastructure assets including Sunset Cliffs Blvd and associated underground utilities. Additionally, construction of approximately 46,000 SF of AC Overlay on Sunset Cliffs Blvd between Adair St and Osprey St. This project consists of the construction of a secant pile wall, a conventional retaining wall, handrail, AC overlay, pedestrian barricades, curb ramps, signage, striping, marking, and the replacement of
|
|
Schroth-Nichols, Elizabeth
|
|
2
|
|
|
Project Location Map:
|
Click Here
|
Estimated Project Schedule(1)
Use mouse wheel to zoom in and out of timeline.
|
|
Schedule to be determined.
|
If timeline does not show, please click here for instructions on how to resolve this.
|
|
Estimated Project Dollar Amount(1)
|
(1)
|
$7,827,900
|
Construction Activity
|
(1)
|
$3,658,266
|
(3)
|
Partially Funded
|
|
To be selected
|
(1)
|
Duration to be determined.
|
|
|
Notes:
1. The cost and schedule data shown here are the City’s current best estimates and subject to frequent change. Changes (if any) are updated once a month.
2. To learn more about Capital Improvement Projects, visit:
The Citizens Guide to the Capital Improvement Program.
3. Fully Funded means there are sufficient funds for construction phase and Partially Funded means that there are insufficient funds for construction phase.
|
For questions or concerns about the project, call the Public Works Department
construction project information line at (619) 533-4207, email
engineering@sandiego.gov,
or
submit your inquiry online.
Please reference the project name in your inquiry.
|
Form PWD1502
|
01/01/2025
|
|
|